Project Cost
- Total Cost: $3,237,059
- USDA Grant: $1,302,100
- USDA Loan: $565,000
- LRNRD Contribution: $59,950
Project Size
- Total of 117 miles of pipeline
- Franklin to Guide Rock, NE, 40 miles
- Highway 136 to Kansas State Line, 6 miles
Billing Rates
- Connection Fee: $1,500 plus construction cost
- Rural: $30 per month, $3.20 per 1,000 gallons
- Inavale: $20 per month, $3.20 per 1,000 gallons
Completed in October of 2005, the Lower Republican NRD’s Rural Water Project services 196 rural hook ups and the Village of Guide Rock with quality drinking water. This water is purchased from the City of Franklin and the Rural Water Project storage facility is a 100,000 gallon tank located four miles south of Franklin.